EN RU
 



 Rosengineering (photos) 

   Concept development2 reports 8 photos
   Design12 reports 90 photos
   Construction9 reports 76 photos
   Engineering protection9 reports 76 photos
   Procurement4 reports 62 photos
   Operation2 reports 38 photos


Construction (9 reports, 76 photos)


Concrete operations
15 photos
Construction headquarters
5 photos
Construction of roads
8 photos
Earth operations
12 photos
Engineering operations
9 photos
Finishing works
12 photos
Roofing operations
10 photos
Sites zoning
3 photos
Warehousing
2 photos

Any modern construction is not possible without well-organized and well-functioning warehouse logistics. Currently “Rosengineering” Company has several sites for storage of material and technical base. They include: warehouse with inflatable hangar in settlement Esto Sadok, with area of 2100 sq. m., warehouse of cement, warehouse of inert materials, and rented warehouse with area of 2000 sq. m. in Adler for storage of cableway cars and designer’s furniture. Our warehouses are equipped with special equipment – the fleet of Company has three telescopic loaders with lifting capacity of 2.5 and 5 tons, five truck cranes with lifting capacity of 25 tons.